👖 Sculpted Retro Shape | Women's Curved Wide-Leg Denim Jeans
👖 Sculpted Retro Shape | Women's Curved Wide-Leg Denim Jeans
Couldn't load pickup availability
SIZE CHART


Our Women's Retro Mid-Rise Curved Wide-Leg Jeans feel a bit sculptural but still can look relaxed and sophisticated. It references vintage styles, yet feels modern.

It's fashioned with curved, wide legs that fall slightly tapered and have cropped, frayed hems. The strategic darts at the knees and calves here are key to creating that cool retro shape.

OUR ADVANTAGES
- Zip-fly & button closure
- Rigid denim fabrication
- Belt loops at waistband
- 4-pocket style
- Subtle distressing
- Tapered bottom hem
- Seam detail throughout
MODEL SHOW



KEY FEATURES
CHIC DARTS DETAILS: They are strategically placed to create a contoured fit that accentuates your curves and flatters your figure.
RETRO-INSPIRED DESIGN: These jeans capture the essence of retro fashion with their mid-rise waist and wide-leg silhouette, offering endless styling possibilities.
MID-RISE WAIST: It sits comfortably on your hips, providing a flattering fit that elongates your legs and creates a balanced silhouette.
WIDE-LEG SILHOUETTE: It allows for ease of movement and creates a flowy, relaxed look that exudes confidence and sophistication.
QUALITY CRAFTSMANSHIP: The stitching and construction are top-notch, they are designed to withstand regular wear and maintain their shape and style over time.
SPECIFICATION
Color: White, Khaki, Black, Light Blue, Dark Blue, Blue-Gray
Material: Denim Blend
Waist: Medium
Size: M, L, XL
Style: Casual, Fashion, Unisex
NOTES
Color may not appear as exactly as in real life due to variations between the computer monitors.
Please allow a small error due to manual measurement. Please make sure you do not mind before purchasing.
